For the Intermediate School we need the following.
Cat6 cabling, jacks connectors averaging 180 ft. per drop. We need 390 drops in 31 different classrooms 2 drops per plate in Block Walls. Cabling needs to be run in wire racks. Drops are to be in the wall no wire molding, no splices, and no sharp bends. Also cat6 cable is not to be run with or in electrical conduit and not to be lying on light fixtures. It will be installed in a 19" lockable rack that we will provide. It will need to pass cat6 test and the Technology Coordinator will need a print out of the test results. With the installation of all the above.
For the Elementary School we need the following.
Cat6 cabling, jacks connectors averaging 180 ft. per drop. We need 166 drops in 14 different classrooms 2 drops per plate in Block Walls. Cabling needs to be run in wire racks. Drops are to be in the wall no wire molding, no splices, and no sharp bends. Also cat6 cable is not to be run with or in electrical conduit and not to be lying on light fixtures. It will be installed in a 19" lockable rack that we will provide. It will need to pass cat6 test and the Technology Coordinator will need a print out of the test results. With the installation of all the above.
For the High School we need the following.
Cat6 cabling, jacks connectors averaging 180 ft. per drop. We need 446 drops in 51 different classrooms 2 drops per plate in Block Walls. Cabling needs to be run in wire racks. Drops are to be in the wall no wire molding, no splices, and no sharp bends. Also cat6 cable is not to be run with or in electrical conduit and not to be lying on light fixtures. It will be installed in a 19" lockable rack that we will provide. It will need to pass cat6 test and the Technology Coordinator will need a print out of the test results. With the installation of all the above.
We also
need Fiber for the High School.
The distance of fiber to the 1st building is 500ft. It will need to be buried in 2”schedule 40 PVC pipe. I will go through asphalt parking lot. The Fiber will need to be multi-mode 12 strains
Terminated with ST connectors. Will also need rack mounted LIU to go in a 19” rack. With media convertors and 6ft. ST – ST fiber patch cords. It will need to be tested and not be above a 5db reading. With installation of all the above.
The distance of fiber to the 2nd building is 200ft. It will need to be buried in 2”schedule 40 PVC pipe. I will go through asphalt parking lot. The Fiber will need to be multi-mode 12 strains
Terminated with ST connectors. Will also need rack mounted LIU to go in a 19” rack. With media convertors and 6ft. ST – ST fiber patch cords. It will need to be tested and not be above a 5db reading. With installation of all the above.